Pre-Shipment QC Checklist for Industrial Parts: What to Check and What Proof to Ask For

For buyersPre-shipment checklistIndustrial parts

When parts come from a factory overseas, you usually see them for the first time after they land. By then, a wrong size or a missing certificate is expensive to fix.

A short, clear checklist changes that. You agree it with the factory before production. Then, before you approve the shipment, you check the factory's proof against it, line by line.

This guide covers metal parts, machined and cast components, fasteners, tools and hardware. Use it as a starting point and adjust it to your own drawing.

Before production: lock the spec

The checklist comes from your drawing and spec, so start there.

  • Drawing version. Write the version on the purchase order. Ask the factory to confirm they are working from it.
  • Critical dimensions. Mark the sizes that really matter, with their tolerances. Not every size on a drawing needs checking on every batch.
  • Material. Name the grade, for example ASTM A105 steel or 6061-T6 aluminum.
  • Tests. Name any test you need, such as hardness, and the range you accept.
  • Finish. Say what "good" looks like: no cracks, no burrs, coating thickness in a range.
  • Marking and packaging. Part number, lot code, labels, and how parts are packed.
  • How many to check. Agree the sample size before production, not after (see below).

The checklist

1. Paperwork

  • Purchase order number and quantity
  • Drawing version the parts were made to
  • Lot or batch number for this shipment

Watch out for: a drawing version that does not match your PO. Everything else can look right and still be wrong.

2. Dimensions

  • Actual measurements for each critical dimension, not just "OK"
  • How many parts were measured
  • What was used to measure: calipers, gauges or a CMM

Watch out for: every reading landing exactly on the target number. Real measurements vary a little. Readings that are all perfect may not be real measurements.

3. Material

  • A material certificate (often called a mill certificate) for the grade on your drawing
  • A heat or lot number on the certificate that links it to this batch

Watch out for: a certificate with no heat number, or one that belongs to a different batch.

4. Hardness and other tests

  • A test report for each test your spec names
  • The number of parts tested and each result, not just "pass"

Watch out for: results without a date or without the number of parts tested.

5. Surface and finish

  • Clear photos of the surfaces that matter, with a ruler or scale in view
  • Coating or plating thickness readings, if your spec has them
  • Notes on any cracks, burrs, rust, dents or scratches

Watch out for: the same photo used twice, or photos that do not show the part number or lot.

6. Fit and function

  • Thread checks with go/no-go gauges for threaded parts
  • A fit check with the mating part, if the part has to assemble with something
  • A simple function test, if the part moves or carries a load

Watch out for: "fit OK" with no record of what it was tested against.

7. Marking and traceability

  • Part number, logo and lot code in the right place
  • Photos that show the marking clearly

Watch out for: a lot code on the parts that does not match the paperwork.

8. Packaging and labels

  • Rust protection, if the parts are bare steel
  • Separators, so parts do not damage each other
  • Box or crate labels, quantity per box and barcode scans
  • Shipping marks that match your purchase order

Watch out for: good parts damaged in transit by poor packing. It happens more often than people expect.

9. Problems and fixes

  • A list of anything that failed or was not checked
  • What the factory is doing about it, and who is responsible

Watch out for: a report with no problems at all. Most batches have something. A factory that reports small problems is usually easier to work with.

How many parts to check

Checking every part is rarely practical, so most buyers check a sample. Many use a standard sampling plan, often called AQL (from ISO 2859-1, or ANSI/ASQ Z1.4 in the US). It tells you how many parts to check for a given batch size, and how many problems you will accept.

Keep it simple:

  • Agree the plan before production. Write it into the order.
  • Sort problems by how much they matter. A crack in a load-bearing part is not the same as a small scratch on a hidden face.
  • Check critical features more strictly. Or check them on more parts.

The checklist on one page

CheckProof to ask forWatch out for
PaperworkPO, drawing version, lot numberWrong drawing version
DimensionsMeasurement sheet with real numbersEvery reading exactly on target
MaterialMaterial certificate with heat numberCertificate from another batch
TestsTest report with each resultNo date, no sample count
FinishPhotos with a scale; coating readingsReused photos
Fit and functionGauge or fit-check records"OK" with no detail
MarkingPhotos of part number and lot codeLot code mismatch
PackagingPacking photos, labels, barcode scansPoor protection for transit
ProblemsList of issues and fixesA report with zero issues

When proof is missing

Missing proof does not always mean bad parts. But it does mean you are deciding without the full picture. You have three options:

  • Wait for the missing proof before the goods ship.
  • Hold the shipment until the problem is fixed.
  • Ship with a note that records what was missing and why you went ahead.

Whatever you choose, write it down: what you saw, what was missing, and who made the call. If a customer asks questions months later, you will have the answer.

Putting it in one place

The hard part is not the checklist. It is collecting the answers from emails, chats and spreadsheets, batch after batch.

That is what an Evidence Passport does. Your spec becomes a checklist, the factory's proof is matched to each check, and anything missing is flagged. Then you decide whether the order ships. We do not inspect or lab-test the parts ourselves; we organize the proof the factory already has.

For the short version of this list, see What to Ask Your Factory For Before You Approve a Shipment.


Scope a $2,500 Pilot on your next order of parts, or talk to us.